Photo Documentation Standards for Water Restoration
Photos are the most common documentation a restoration contractor produces and the most commonly mishandled. A folder of 400 photos with no structure is worth less to an adjuster than 80 photos that follow a predictable sequence.
Sequence by room and phase
Every room should be photographed in the same order at each phase: wide shot first, affected materials next, meter readings, equipment placement, and any removal in progress. The same sequence on every job makes the file scannable.
Timestamp and location data
Photos without timestamps and GPS data leave the adjuster trusting the contractor's word on when and where the work happened. Native phone camera apps strip this data inconsistently. A capture tool that preserves it removes the question.
Cover what the invoice claims
Every line item on the invoice should have a photo behind it. Equipment placement photos justify equipment days. Material removal photos justify removal scope. Meter reading photos justify the moisture map. If a line item has no photo, it is the easiest line for an adjuster to cut.
Daily progress photos
A short daily photo set — equipment still running, structure progressing — supports the drying log and shows the job was actively monitored. Files that only contain day-one and day-final photos look like the equipment was placed and forgotten.