IICRC S500 Documentation Checklist for Water Restoration
The IICRC S500 Standard for Professional Water Damage Restoration is the document carriers reference when auditing a claim. This checklist walks through the documentation a contractor should be able to produce for every S500 job, in the order an adjuster will look for it.
1. Category and class of loss
Document the category (1, 2, or 3) and the class (1 through 4) on day one, with the rationale. The category drives sanitation scope; the class drives drying equipment load. Both decisions need to appear in the file before any equipment hours are billed.
2. Drying goal
Establish the drying goal — the moisture content the affected materials need to reach — at the start of the job. The goal should reference unaffected materials in the same structure as the baseline. Without a stated goal, daily progress has nothing to be measured against.
3. Initial moisture map
Map every affected material with an initial moisture reading and a location identifier. This becomes the baseline the drying log measures against and the evidence that the scope of removal was justified.
4. Daily psychrometric and moisture data
Record indoor and outdoor temperature, relative humidity, GPP, and moisture content readings each day. Tie each reading to the room and material it represents.
5. Equipment placement rationale
Log every air mover, dehumidifier, and air scrubber by location and runtime. Note why each piece was placed where it was — class-of-loss equipment load is the math behind this.
6. Scope decisions and changes
Document every removal, every change in scope, and every customer or adjuster communication that affected the work. Decisions that aren't in the file effectively didn't happen.
7. Final readings and sign-off
Close the file with final moisture readings showing the goal was met, a final photo set, and a customer or adjuster acknowledgment. This is the moment the file becomes audit-ready.